Further to site walk on 17.10.16, we hereby confirmed for SC to proceed with the following work:.
1. To omit door at and bookshelf wall at level 4F-5F total of 8 nos compact bookshelf
room 425,411,435,449,525,549,535,511
2. To provide carpet tile finish in lieu of porcelain tile for compact bookshelf
room 425,411,435,449,525,549,535,511,at level 4F-5F
3. To provide brickwall in lieu of bookshelf wall at level 2F compact bookshelf room
241,224,259,278 (see drawing)
4. To provide fire door D15THF for door 259b, 278b,241b,224b in lieu of door type D15TH at
level 2F compack bookshelf room 241,224,259,278 as per Bomba requirement
5. To top up 100mm at 8F demarcated area (refer drawing) with brickwork and min 50mm concrete
topping complete with wire mesh
6. To cast slab over level 1F terrace void area adjoining Auditorium at GL 1B/J-H (to engr's detail)
SC is required to liaise with QS for assessment of associated variation cost
往上 17.10.16 的网站走,我们特此确认为 SC 进行下列工作:。1.对省略门口和在 8 号紧凑书架级别书架墙 4F 5F 共425411435449525549535511 的房间2.向提供地毯面砖代替瓷质砖紧凑的书架在水平 4F-5F 客房 425411435449525549535511,3.为客户提供以书架墙在水平紧凑书架房间 2F 代替砖墙241,224,259,278 (见图)4.向门 259b,278b,提供防火门 D15THF 241b,224b 门代替键入在 D15TH按消防要求的水平 2F compack 书架房间 241,224,259,2785.到充值 100 毫米在 8F 划定区域 (请参阅绘图) 民 50 毫米混凝土与砌体一流的完整与丝网6.对铸板做不完级 1F 露台无效的空体面积毗邻礼堂举行 GL 1B/h-H (到工程师的详细信息)SC 被需联络与打印机相关联的变化成本评估
正在翻譯中..
![](//zhcntimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)
继在16年10月17日现场的步行路程,我们在此证实了SC与下列工作:
1。在4F-5F共8号小型书架的水平省略在门口的书架墙
室425,411,435,449,525,549,535,511
2。为了提供地毯结束代替瓷质砖的紧凑型书架
的房间425,411,435,449,525,549,535,511,4F-5F在级别
3。在小巧的书架室2F水平提供代替书架墙砖墙
241224259278(见图)
4。要为门D15THF 259B,278B,241B,224B代替门式D15TH在提供防火门
级2F睿房间的书架火241224259278按规定
5。在8F划定区域(见制图)用一个50毫米分钟砖墙和混凝土补足百毫米
馅料配有金属网
6。要通过空区相连的露台1F礼堂GL 1B / JH铸坯级(工程师的细节)
SC需要具有QS联络以相关的成本变化评估